Services

Six services. Stack any combination.

Order each independently or stack as turnkey. Same engineers, same project memory, one invoice.

01

PCB Fabrication

Prototype to small-batch FR-4 / aluminum / flex / Rogers boards.

Open PCB Fabrication
  • 1 to 20 layers — green / red / yellow / blue / black / matte
  • HASL, ENIG, OSP, Hard Gold, Imm-Tin, Imm-Silver
  • Castellated holes, edge plating, impedance control, gold fingers
  • Flying probe testing on every board (+ 4-wire Kelvin if needed)
  • 72-hour standard turnaround. Bengaluru pickup.

02

Stencils

Solder paste stencils with or without aluminum frame.

Order a stencil
  • With or without frame (380×280 to 736×736 mm)
  • 0.10 / 0.12 / 0.15 / 0.20 mm foil thickness
  • Half-etched fiducial marks for SMT line vision pickup
  • Optional electropolishing for fine-pitch QFN / BGA
  • Auto-extracted paste layers from your Gerber zip

03

BOM Sourcing

Live pricing across DigiKey India, Mouser India, LCSC, Shara stock.

Cost out a BOM
  • Auto-detects KiCad / Altium / EasyEDA / custom BOM formats
  • Classifies SMD vs THT, counts solder joints per package
  • Pick-and-place file → top/bottom side breakdown
  • India-first sourcing matrix to dodge international shipping
  • Lifecycle / NRND / EOL flags so you don't spec dead parts

04

Assembly

SMT + THT assembly with per-side joint costing.

Get assembly quote
  • SAC305 lead-free or Sn63/Pb37 leaded paste
  • Standard / expedite / rush turnarounds
  • Conformal coating (acrylic, urethane, silicone)
  • In-circuit and functional test, X-ray inspection for BGA
  • Per-board joint count drives the quote — no padding

05

Design Review

Senior engineer + AI checklist audit before fab.

Coming Phase 1C
  • Schematic + BOM + Gerber audit
  • Blocker / High / Medium / Low findings report
  • IPC-2221B clearance, regulator FB math, antenna keep-out
  • AC-under-MCU and isolation slot detection for mains designs
  • 24-hour turnaround on first review

06

NPI Blueprints

Pre-design execution plan — requirements, architecture, risk.

Coming Phase 1D
  • Requirement freeze — what success looks like
  • Architecture pick (MCU / radio / power / sensors)
  • Component selection with India-stock alternates
  • Compliance plan (BIS / CE / FCC / RoHS)
  • Phase-gated schedule — no surprises in week 12

Want all six on one project?

Turnkey customers get a dedicated engineer, faster turnarounds, and ~30% off compared to ordering each service à la carte.